Villa design
Domestic staff quarters: dignified, independent design
A dignified, independent design for staff rooms: location, comfort and separation.

Staff quarters should be dignified and independent.
- Located near the kitchen and service area, with separate access.
- A room with a real window, ventilation and a private bathroom.
- Air conditioning, power and storage.
- Separation that protects the privacy of both sides.
Flexibility
A well-built room can later serve as a store or office.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design

