The home pool: location, waterproofing and privacy
Location, waterproofing, safety and privacy: what a home pool needs to be designed properly.

A home pool needs thoughtful location, careful waterproofing and privacy.
Location
Choose a spot with some shade, away from boundary walls that overlook neighbours, with access to services.
Structure and waterproofing
The pool is a watertight structure; leaks are costly to find and fix. Test it before finishing.
Equipment and safety
A plant room, filtration, a fence or cover as safety requirements dictate, and non-slip surroundings.
Privacy
Screens, planting and layout protect users from view.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering

