Supervision & construction

Aluminium window installation: details that keep water and dust out

Fixing, sealing, drainage and a water test.

Arkan engineering team 2 min read

Details keep water and dust out.

  • Correct fixing and levelling.
  • Sealant and weather strips.
  • Drainage channels clear.
  • Test with a water spray.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Engineering Supervision