Commercial & industrial
Receiving a commercial building: checklist before letting
Certificates, tests, finishes, meters and documents: a handover checklist before letting.

Before letting, check the building thoroughly.
- Final approvals and certificates.
- Fire, electrical and air-conditioning tests.
- Finishes, doors and windows.
- Meters and utility accounts.
- As-built drawings, manuals and warranties.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Engineering Supervision
