Terms & Conditions
Last updated: 1 November 2026
By using arkanec.com you accept these terms. If you do not agree, please do not use the site.
Nature of content
Articles and information on the site are for general awareness and are not engineering advice for a specific project. Regulations vary by authority and location and change over time; consult a qualified engineer and the official authorities before acting.
Intellectual property
All designs, images, text and logos shown belong to Arkan Engineering Consultants or are licensed to it. Copying, republishing or commercial use without written permission is not allowed; sharing article links with attribution is welcome.
External links
The site may link to other websites whose content we do not control and for which we take no responsibility.
Limitation of liability
We work to keep information accurate but do not guarantee it is error-free and accept no liability for decisions made on it without professional advice. Signed contracts alone govern the contractual relationship between Arkan and its clients.
Governing law
These terms are governed by the laws of the United Arab Emirates and the Emirate of Ras Al Khaimah, and the courts of Ras Al Khaimah have jurisdiction over any dispute.