Hospital project — Ras Al Khaimah
ADNOC station — Jebel Jais
Classic palace — Arkan design
Mixed-use building — Arkan design
Modern villa — Arkan design

Arkan Engineering Consultants · Ras Al Khaimah

We design and supervise
what lasts.

Architectural, structural and MEP design, with engineering supervision from permit to handover — 600+ projects since 2017, from private villas to hospitals and ADNOC and Emarat stations.

600+

Projects delivered

250+

Villas & residential complexes

35+

Government & corporate partners

2017

Founded in Ras Al Khaimah

Hospital project in Ras Al Khaimah
2017Ras Al Khaimah

01About us

An engineering office built on trust

Arkan Engineering Consultants was founded in 2017 in Ras Al Khaimah by a group of architects, and built its reputation on efficient management and an exceptional team. Since then the firm has completed more than 600 projects, from luxury villas and homes to large-scale work such as hospitals and petrol stations.

Arkan is known for its flexibility and its deep understanding of client needs, which lets it shape solutions around each project's requirements. That capability has earned the trust of clients in the UAE and beyond — and keeps Arkan delivering the highest levels of service and quality as a trusted strategic partner in the region's construction and development sector.

  • Licensed engineering consultancy in Ras Al Khaimah since 2017
  • Engineers registered and classified with Ras Al Khaimah Municipality
  • Members of the Society of Engineers – UAE
  • Etihad Water & Electricity licensed electrical engineer
Read more

02Our services

Everything your project needs, under one roof

A complete team of architects and structural, mechanical, electrical and supervision engineers.

01

Architectural Design

From first idea to construction drawings: villas, residential, commercial and public buildings that balance beauty, function and budget.

Details
02

Structural Engineering

Safe, economical structures: analysis and design of foundations, concrete and steel frames to recognised codes and Municipality requirements.

Details
03

Mechanical Engineering

HVAC, ventilation, drainage, water supply and fire-fighting systems — energy-efficient and aligned with Civil Defence requirements.

Details
04

Electrical Engineering

Lighting, power, load schedules, distribution boards and low-current systems — with drawing approval at Etihad Water & Electricity.

Details
05

Interior Design

Complete interiors: layout, furniture, lighting, materials and finishes — with working drawings and realistic visuals before work starts.

Details
06

Engineering Supervision

Construction supervision at every scale — from private villas to healthcare facilities and petrol stations — with regular reports and material and payment approvals.

Details
07

Project Management

Planning, scheduling, cost and risk control by PMP-certified engineers — from tender and award to handover.

Details
08

Project Cost Reduction

Value engineering, quantity and specification review to cut cost without touching quality or safety.

Details
09

Permits & Authority Approvals

We take your file through Ras Al Khaimah Municipality, Civil Defence, Etihad WE and other authorities — to permit and completion.

Details

—Sectors

Sectors we serve

Experience across building types, from the private home to the public facility.

04How we work

From idea to handover

  1. 01

    Brief & study

    We listen, visit the site and review plot regulations and budget.

  2. 02

    Concept design

    Plans and 3D visuals developed with you until approved.

  3. 03

    Detailed design

    Coordinated architectural, structural and MEP drawings.

  4. 04

    Permits & approvals

    We handle the Municipality, Civil Defence and Etihad WE through to the permit.

  5. 05

    Site supervision

    Site visits, regular reports, material and payment approvals.

  6. 06

    Handover

    Inspection, completion certificate and snag close-out.

05Partners

Organisations that trust us

ADNOC Emarat Government of Ras Al Khaimah Presidential Court Ras Al Khaimah Municipality Public Services Department Sheikh Zayed Housing Programme RAK Hospital RAKEZ etisalat by e& Sharjah Islamic Bank Americana Restaurants Stantec Hassan Allam Holding RAK Gas RAK Real Estate Yas Properties KAAF Real Estate Juma Al Majid Est. R.A.K Club
Al Jazirah Al Hamra Club Al Rams Club Horton Amana Contracting D-One Marine Terra Firma Terra International Construction Condor Al Madar Silver Coast Al Sitara Gulf J&D Gulf Al Badr GCC Desarch Scaffolding Texas Measurement Solutions Inner Space Falcon Air Conditioning Ultraforce

08Contact

Have a plot or a project in mind?

Visit us in Al Nakheel, Ras Al Khaimah, call us, or send your project details and an engineer will get back to you.