Lighting, power, load schedules, distribution boards and low-current systems — with drawing approval at Etihad Water & Electricity.
Our electrical team, led by an Etihad Water & Electricity licensed engineer, designs lighting, power, load schedules and distribution boards, as well as low-current systems such as CCTV, telecom and alarms. We prepare the service-utility drawings, submit them for approval and follow through to power connection.
We use lighting-calculation software to hit the right lux levels without waste, and design to Barjeel green-building requirements and recognised British safety standards — because correct electrical design cuts consumption and protects the building and its occupants.

Utility approvals in three stages: design, construction and connection, and where delays usually come from.