The electrical load schedule: the document that sizes everything

The document that sizes cables, boards and supply: why it must be realistic.

Arkan engineering team 2 min read

The load schedule lists every connected load and sizes cables, boards, breakers and the supply request.

  • It must be realistic, including air conditioning and future additions.
  • Utilities review it before granting supply.

An underestimated load means redesign and delay.