MEP & sustainability
Low water pressure upstairs: causes and fixes
Undersized pipes, pump settings, filters and air: causes and fixes for low upstairs pressure.

Low pressure upstairs usually comes from undersized pipes, a poorly sized pump, blocked filters or air in the system.
- Check pump selection and pressure settings.
- Inspect filters and valves.
- Consider a booster set for tall houses.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Mechanical Engineering


