Supervision & construction
Interlock paving: the right base prevents sinking
Compacted base, even sand bed, edge restraints and falls prevent sinking.

Sinking interlock comes from what is beneath it.
- Compacted natural soil.
- A compacted granular base in layers.
- A thin, even sand bed.
- Pavers, sand in the joints and final compaction.
Also check falls, edge restraints and paver thickness for the load.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Engineering Supervision
