Arkan design Residential buildings · Design
Safe, economical structures: analysis and design of foundations, concrete and steel frames to recognised codes and Municipality requirements.
Good structural design is invisible, yet it decides both safety and frame cost. Our structural engineers, registered with Ras Al Khaimah Municipality, design foundations, columns, beams and slabs in recognised software such as ETABS, SAFE and SAP2000, working from the soil report, wind, seismic and occupancy loads.
The aim is a frame with no more steel and concrete than it needs — and no less. Over-conservative design inflates cost; under-designed structure risks safety. We also review third-party structural drawings and assess existing buildings for extensions and alterations.
For most projects, yes — bearing capacity and groundwater level decide the foundation type and its cost.

A soil report is the cheapest and most valuable document in your project. What it contains and how it changes foundation cost.
2 min read

Isolated, strip, raft or piles? How soil, loads and water table decide the foundation type in the UAE.
2 min read

Adequate cover, dense concrete and proper spacers fight corrosion in Gulf buildings.
2 min read