Structural engineering

Concrete cover and rebar corrosion: the silent enemy of Gulf buildings

Adequate cover, dense concrete and proper spacers fight corrosion in Gulf buildings.

Arkan engineering team 2 min read

Salt and humidity attack steel inside concrete.

  • Specify adequate concrete cover and a dense, low-permeability mix.
  • Use spacers that hold reinforcement in place during pours.
  • Consider protective coatings in coastal areas.

Corrosion is the silent enemy of Gulf buildings.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering