Structural engineering

Structural loads made simple: dead, live, wind and seismic

Dead, live, wind and seismic loads, and why changes need an engineer.

Arkan engineering team 2 min read

Every building resists forces.

  • Dead loads: the building's own weight.
  • Live loads: people, furniture and vehicles.
  • Wind: pressure that grows with height.
  • Seismic: required by code, especially in the north.
  • Other: temperature, earth and water pressure.

Any change to the structure needs recalculation by an engineer.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering