MEP & sustainability

Home electrical safety checklist

RCDs, sockets, cables and wet areas: a home electrical safety checklist.

Arkan engineering team 2 min read

  • Check RCD protection and test it.
  • Inspect sockets, cables and boards for heat marks.
  • Avoid overloaded extensions.
  • Keep wet areas protected.
  • Have the installation inspected periodically.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Electrical Engineering