Cooling load calculation: why "one ton per X square metres" is not enough
Orientation, glazing, insulation and occupancy decide the load, not a rule of thumb.

A rule of thumb such as one ton per fixed area ignores orientation, glazing, insulation, occupancy and equipment.
A proper calculation sizes the system correctly: too small fails in summer; too large cycles on and off, costs more and dehumidifies poorly.