Mechanical Engineering

HVAC, ventilation, drainage, water supply and fire-fighting systems — energy-efficient and aligned with Civil Defence requirements.

In the UAE climate, air-conditioning is the largest part of a building's running bill, so we never treat it as an afterthought. We calculate cooling loads room by room, select the right system for the project's size and use, and design water supply, drainage, stormwater and fire-fighting/alarm systems to Civil Defence requirements and Ras Al Khaimah's Barjeel green building regulations.

Early coordination between mechanical, architectural and structural design prevents the classic site problems: ducts clashing with beams, false ceilings dropping too low, drains without proper falls. That coordination is built into how we work.