MEP & sustainability

Barjeel green building regulations in Ras Al Khaimah: what they mean for you

Barjeel sets minimum energy and water performance for new buildings in Ras Al Khaimah. What it affects and why to design for it from day one.

Arkan engineering team 2 min read

Barjeel is the green-building regulation applied to new buildings in Ras Al Khaimah. It sets minimum performance for energy and water, so a building costs less to run.

What it affects

  • Thermal performance: insulation levels in walls and roofs.
  • Glazing: limits on heat gain through windows.
  • Cooling and lighting efficiency: minimum standards for equipment.
  • Water use: efficient fixtures and fittings.

What it means for your project

The requirements are reflected in the design and drawings, and the authority verifies them during review. Treating them as a design input from day one costs far less than retrofitting after a comment.

The benefit

Lower electricity bills for years, better comfort, and a building that meets the standard buyers and tenants increasingly expect.

How Arkan handles it

Thermal calculations and specifications are prepared with the design, so compliance is built into the first submission.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Mechanical Engineering