MEP & sustainability
Central gas installations in buildings: safety first
Tanks, pipework, leak detection and testing: safe central gas installations.

Central gas is safe when designed to regulations and installed by a licensed contractor.
- Tanks in open, ventilated locations away from ignition sources.
- Approved pipework with isolation valves.
- Leak detection and automatic shut-off where required.
- Pressure testing and certificates before operation, plus periodic maintenance.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Mechanical Engineering
