Villa design

The outdoor majlis: a comfortable winter gathering

An outdoor majlis for winter gatherings: shade, comfort, services and position.

Arkan engineering team 2 min read

The outdoor majlis extends hospitality into the cooler months.

  • Shade and wind protection.
  • Comfortable seating and floor finishes.
  • Lighting and power, and heating for winter if desired.
  • Access to a service route and washroom.

Position

Away from neighbours' views and with a pleasant outlook.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design