Villa design
A home that grows with the family: flexible design
Design for the family in ten years: flexible rooms, extra floor, independent wing and spare services.

A villa lasts decades, and families change.
- A flexible ground-floor room with a bathroom.
- Structure prepared for an extra floor, where allowed.
- A wing that can become independent.
- Spare conduits and pipework for future needs.
Ask early
Discuss ten-year family plans in the first meeting; the answer changes the design.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design


