Structural engineering
Waterproofing wet areas: bathrooms, kitchens and balconies
Membrane, details and a flood test before tiling.

- Apply a full membrane on floors and up walls in bathrooms, kitchens and balconies.
- Detail drains and penetrations.
- Flood test for 24 hours before tiling.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering


