Structural engineering
Strengthening buildings: carbon fibre, concrete jacketing and steel bracing
Carbon fibre, jacketing or bracing: chosen after assessment.

- Carbon fibre wrapping adds strength with little thickness.
- Concrete jacketing enlarges members.
- Steel bracing adds stiffness quickly.
A structural engineer chooses based on assessment.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering


