Structural engineering

The roof in a hot climate: the most sun-exposed surface of your home

Slope, waterproofing, insulation and reflective finishes for the most exposed surface.

Arkan engineering team 2 min read

The roof receives the most sun.

  • Slope, waterproofing and thermal insulation in the right order.
  • Light-coloured finishes to reflect heat.
  • Shade over terraces and equipment.
  • Easy drainage and maintenance access.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering