Structural engineering

Waterproofing foundations and basements: a step you cannot redo

A step you cannot redo: continuous membrane, protected and photographed before covering.

Arkan engineering team 2 min read

Foundation and basement waterproofing cannot be redone once buried.

  • Apply a continuous system with proper details at joints.
  • Protect the membrane during backfilling.
  • Test and photograph before covering.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering