Structural engineering

Inspecting reinforcement before pouring: what the eye can check

Diameters, spacing, laps, cover and cleanliness, photographed before the pour.

Arkan engineering team 2 min read

Check before every pour:

  • Bar diameters and spacing against drawings.
  • Laps and anchorage lengths.
  • Cover, with spacers.
  • Cleanliness and fixing.

Photograph before the concrete hides it.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Engineering Supervision