Structural engineering
Pre-construction termite treatment
Treat the soil once, at the right time, and obtain a warranty.

Treat the soil before slabs are poured.
- Use approved chemicals at the specified rate.
- Treat after final soil preparation.
- Obtain a warranty certificate.
Afterwards, avoid wood touching soil and fix leaks quickly.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering


