Structural engineering
Roof waterproofing and thermal insulation: the right layer order
Right layer order, careful details and a flood test.

Layer order matters.
- Slope to drains, waterproofing membrane, protection, thermal insulation and finish, in the right sequence for the system chosen.
- Detail upstands, drains and penetrations carefully.
- Test by flooding before finishing.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering

