MEP coordination: why ducts clash with beams on site

Coordinate disciplines before construction and fix sleeves before pours.

Arkan engineering team 2 min read

Ducts clash with beams when disciplines draw separately.

  • Coordinate on a combined layout before construction.
  • Fix sleeves and openings before concrete is poured.
  • Resolve clashes on paper, not on site.