Structural engineering

Pre-pour concrete checklist

Formwork, reinforcement, sleeves, mix and curing before every pour.

Arkan engineering team 2 min read

Before any pour check:

  • Formwork stable and clean.
  • Reinforcement diameters, spacing and cover as drawn.
  • Sleeves and electrical conduits in place.
  • Concrete mix approved and tested.
  • Curing plan ready.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Engineering Supervision