Structural engineering

Water tanks: ground or roof? Keeping them clean

Ground or roof, sizing, hatches and cleaning for villa water tanks.

Arkan engineering team 2 min read

  • Ground tank: cooler, no roof load, needs a pump and careful waterproofing.
  • Roof tank: gravity pressure, heats in summer and adds load.
  • Provide a sealed inspection hatch, insect-proof vent and regular cleaning.
  • Keep clear of sewer lines.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Mechanical Engineering