Structural engineering

Assessing an existing building before buying, extending or renovating

Inspect, test and report before buying, extending or renovating.

Arkan engineering team 2 min read

Before buying, extending or renovating, assess the structure.

  • Review drawings and history.
  • Inspect for cracks, corrosion and settlement.
  • Test materials where needed.
  • Report what is sound and what needs work.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering