Structural engineering
Expansion joints: why engineers split a building
Joints let a building move so heat does not crack it.

Buildings expand and contract with temperature.
Joints split a large structure into movable parts so stresses do not crack it. They must be continuous, sealed and carried through finishes.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering

