Structural engineering
Slab types: solid, hollow block or flat slab?
Solid, hollow block, flat or post-tensioned: height, cost and service flexibility.

The slab is the largest concrete element.
- Solid with beams: traditional for small spans, with drop beams.
- Hollow block (ribbed): lighter and better insulated, common in villas.
- Flat slab: no drop beams, free service routes, ideal for offices and commercial.
- Post-tensioned: for large spans with minimum thickness.
The structural engineer decides with the architect and MEP engineers.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering
