Structural engineering

Documenting neighbouring buildings before excavation

Dated photos and crack records protect you from later claims.

Arkan engineering team 2 min read

Before excavation, document neighbouring buildings.

  • Dated photos of facades, walls and paving.
  • Measure and mark existing cracks.
  • Share the record with the neighbour.

It protects you from later claims.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Engineering Supervision