MEP & sustainability
Locating the electrical room and boards: an architectural decision first
Close to loads, accessible, dry and ventilated: placing the electrical room.

The electrical room's location is an architectural decision first.
- Close to loads and the meter, with safe access.
- Ventilated, dry and away from water.
- Enough clear space for maintenance.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Electrical Engineering

