Green buildings: extra cost or investment?

Many measures are mandatory and pay back through lower bills; the key decisions are made at design.

Arkan engineering team 2 min read

Many green requirements in the UAE are already mandatory, and most pay back through lower bills.

High-return measures

Good insulation, efficient glazing and shading, right-sized efficient air conditioning, LED lighting and water-saving fittings.

Measures needing study

Solar panels and greywater reuse depend on consumption, space and tariff.

Conclusion

The best green building is the smartest, not the most expensive, and the key decisions come at design stage when they cost almost nothing.