MEP & sustainability
Plumbing and drainage: mistakes that show up after you move in
Falls, access, venting and valves: plumbing mistakes that appear after moving in.

Mistakes show up after you move in.
- Poor falls or undersized drains.
- Missing access points.
- Wrong vent arrangements causing odours.
- No isolation valves.
Test pressure and flow before covering pipes.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Mechanical Engineering

