Completion certificate: the last step before moving in, and what delays it

The last formal step before moving in: what is checked, which documents are needed, and what commonly delays it.

Arkan engineering team 2 min read

The completion certificate is the last formal step before you can move in and connect permanent services. It confirms that the building was completed as permitted and meets safety requirements.

What the authorities check

  • Built work matches the approved drawings.
  • Fire and life-safety systems are installed and tested.
  • Electrical and water installations are inspected.
  • Final inspection by the municipality and, where required, Civil Defence.

Documents usually required

As-built drawings, test reports, supervisor's completion letter, utility clearances and the contractor's final statement.

What delays it

Unreported changes during construction, failed fire tests, missing test reports and unresolved inspection comments. Each is easier to fix before the final inspection than during it.

Practical advice

Ask your supervising consultant to run a pre-inspection snagging round, close every open item, and compile the documents in advance. The certificate then follows quickly.