Why your consultant must be classified with the Municipality
Only a classified consultant can submit your drawings. What classification means and how to check it.

Only a consultant classified by the municipality for the relevant building category can submit permit drawings.
What classification means
It confirms the firm's engineers are registered and qualified to design buildings up to a certain size or complexity, and accountable for their drawings.
Why it matters to you
An unclassified consultant cannot legally sign your submission; using one risks rejection and lost time.
What to check
Ask for the classification category and verify that it covers your building's height and use.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Permits & Authority Approvals

