Architecture
How to read architectural drawings: a simple owner's guide
Plans, elevations, sections, details and schedules: how an owner can read architectural drawings.

An owner does not need to be an engineer to read drawings.
- Plans: a horizontal slice showing rooms and walls; check room sizes and relationships.
- Elevations: the building seen from the outside; check proportions and openings.
- Sections: a vertical slice showing heights and levels.
- Details: how key parts are built.
- Schedules: doors, windows and finishes.
Tip
Ask your consultant to walk you through each sheet and mark what you approve before the next stage.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design

