Interior design
Bathroom design: waterproofing, falls and ventilation before looks
Waterproofing, falls and ventilation before finishes.

Technical points come before looks.
- Full waterproofing with tested falls to the drain.
- Good ventilation.
- Separate wet and dry areas.
- Non-slip floors and safe electrics.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Interior Design