Interior design

Majlis furniture: floor seating or modern sofas?

Floor seating or sofas: layout, circulation and lighting for the majlis.

Arkan engineering team 2 min read

Floor seating suits tradition; sofas suit modern comfort.

  • Mix to serve different guests.
  • Keep clear circulation and sightlines.
  • Provide side tables and lighting at each seating group.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Interior Design