Architecture
Public parks: green spaces that work in a hot climate
Shade, sustainability, access and maintainability: public parks that work in the heat.

Successful parks in a hot climate are the most used, not the greenest.
- Shade first: trees, canopies and shaded routes.
- Sustainability: native plants, drip irrigation and light-coloured surfaces.
- For everyone: accessible paths, washrooms, prayer areas and evening lighting.
- Maintainability: materials and systems the operator can service.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design


