Architecture

Designing nurseries and small schools: child safety first

Safety, supervision, light, hygiene and shaded play: key points for nurseries and small schools.

Arkan engineering team 2 min read

Child safety comes first in nurseries and small schools.

  • Rounded corners, safe surfaces and secure entrances.
  • Good supervision lines, with glazing to see rooms.
  • Natural light, ventilation and acoustics suited to learning.
  • Hygiene, with accessible child-height washrooms.
  • Shaded outdoor play with safe surfaces.
  • Compliance with the education authority's requirements before design is finalised.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design