Architecture

Façade maintenance: dust, humidity and salt

Dust, humidity and salt: planning access, materials and schedules for facade maintenance.

Arkan engineering team 2 min read

Dust, humidity and salt age facades faster than expected.

Plan access

Design anchor points or cradles for cleaning tall facades.

Choose materials

Surfaces that resist staining and can be washed.

Schedule

Regular washing, resealing of joints and repainting cycles keep the building looking new and protect the structure.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design