Architecture

Sun-shading devices: protecting the façade without blocking daylight

Overhangs, fins and screens outside the glass cut heat gain while keeping daylight.

Arkan engineering team 2 min read

Shading cuts heat gain without losing daylight.

  • Horizontal overhangs suit south facades.
  • Vertical fins suit east and west.
  • Screens and louvres filter light and add character.
  • Placing shading outside the glass is far more effective than blinds inside.

Design with the sun

Test shading in the 3D model so it works at different times of year.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design