Permits & regulations

Neighbour privacy in design: windows, balconies and roofs

Windows, balconies and roofs: the privacy rules that apply and how to design around them.

Arkan engineering team 2 min read

Privacy is regulated as well as desirable.

Typical rules

Windows facing neighbours must be offset or screened, balconies set back or screened, and roof terraces have parapets of required height.

Design solutions

Screens, high-level windows and carefully placed openings keep light without exposing views.

Result

Fewer comments from the authority and fewer disputes with neighbours.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design