Sound insulation in residential buildings
Heavier walls, floating floors and sealed gaps: how to limit sound transfer between apartments.

Sound transfer is among the most common complaints in apartment buildings.
Where it travels
Through walls, floors, shared services and gaps around openings.
Solutions
Heavier or double walls, floating floors, sealed penetrations and isolated plant and pipework.
Plan early
Insulation is cheap in design and nearly impossible to add later.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design

