Architecture
Daylight in the UAE: letting light in while keeping heat out
Letting light in while keeping heat out: high windows, shading, light surfaces and good glazing.

The aim in the UAE is daylight without heat.
Strategies
- High windows and light wells that bring diffuse light deep into rooms.
- Deep reveals, overhangs and screens that block direct sun.
- Light-coloured internal surfaces that bounce light.
- Glazing with a low solar-heat-gain coefficient on exposed sides.
Result
Lower lighting and cooling energy, and rooms that feel bright and comfortable.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design
