Façade design: rhythm and proportion over more elements
Rhythm and proportion beat adding more elements: how a facade is composed.

A good facade is composed, not decorated.
Rhythm
Repeating openings and solids at a consistent beat give calm and order.
Proportion
Relationships between height, width and openings matter more than the number of features.
Depth
Shadows from recesses and overhangs animate the surface and protect against sun.
Restraint
Fewer materials and details, well executed, age better than many elements competing.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design

